WSDOT

I-90/Liberty
Park to Havana Street- 
During evening and overnight hours, from about 9 p.m.
until the following morning at 5 a.m., be alert for on and off
ramp closures and outside lane closures from 7 p.m. to the following morning at
6 a.m. as crews replace lighting along the freeway.



North
Spokane Corridor/Francis Avenue Bridge and Intersection Improvements- 
Through
the morning of Saturday May 31st the project will have work going on
24 hours per day. During the day traffic will be managed utilizing traffic
shifts around the traffic island construction and the inlay striping. At night
from 7 p.m. to 5 a.m. the Francis/Market intersection will have the signal turned
off with flaggers controlling traffic. No right turns will be allowed from
westbound Francis to northbound Market Street. This is necessary for the
Contractor to complete signal work including hanging the 65’ long mast arms.
Motorists should expect very long delays during the mast arm installations.

NSC/BNSF
Railway Structures/Realignment; Ped/Bike Trail Extension- 
Drivers on Freya, north of Francis, should be alert for flaggers directing
traffic as trucks enter and exit the work area.
US
2/Espanola Road to Interstate 90- 
Between the hours of 7 p.m. and 6 a.m., Monday through
Friday, expect intermittent lane closures in the vicinity of
Flint Rd. Flint Road is closed from US 2
to the south.  A detour is available.  Flint Road is closed to the
north between 7 p.m. and 6 a.m., Monday through Friday.  No work or US 2 lane
restrictions over the May 31-June 1st weekend due to heavy traffic
for Skyfest.
US
195/Hatch Road to Cheney-Spokane Road ITS-
 Possible shoulder and/or intermittent lane restrictions to construct a fiber optic link along US 195 from Hatch
Road to Cheney-Spokane Road. Add 4 new traffic cameras and
traffic volume monitoring equipment.
US
195/Cheney-Spokane Road Interchange- 
Northbound on and off-ramps, plus the southbound off-ramp are open to
traffic.  The southbound on-ramp is under construction.  Drivers need
to use Qualchan Road to access southbound US 195 during this work.  The
Qualchan Road intersection is restricted to southbound access only.  No
left-turns or cross traffic are allowed.  


SPOKANE VALLEY
Adams Rd. from 4th to Sprague – closed through late June for resurfacing.  Signs redirect
traffic via Progress Rd.

Argonne Road from Broadway Ave. to Sprague Ave. – Reduced to one
lane southbound through early July for resurfacing, stormwater
drainage improvements and sidewalk work. 

Sprague Avenue from University Rd. to Herald Rd. – Reduced to
two lanes westbound through early July for resurfacing,
stormwater drainage improvements, and sidewalk work. 

Woodruff Road between Montgomery and Knox – Closed from 7 p.m. to 6 a.m. on Monday, June 2 and Tuesday,
June 3 for street maintenance.  Signs will redirect traffic via Locust and
Shannon.

SPOKANE CITY
Freya Bridge Inspection-  The Freya Bridge will be inspected Thursday,
June 5 starting at 8 a.m. Freya between Trent and Springfield alternately will have one lane
closed in each direction during the inspection work.

29th Avenue and Southeast Boulevard Construction-   The intersection’s south leg is closed; limiting access from 29th
Ave east/west traffic and south traffic from Southeast Blvd.  Southbound traffic can’t access Southeast Blvd from 29th Ave
and is detoured to the 29th Ave and Regal St intersection. Southeast Blvd northbound traffic is closed at the intersection of
Regal St and Southeast Blvd. Crews there are intalling a water line service tap.

Main and Howard Lane Closure- Monday,
June 2 through Friday, June 6, one eastbound Lane will be closed on Main Avenue at
Howard Street.

Howard Street Lane Closure- The eastbound Transit Only Lane on Riverside Ave. just east
of Howard St. is closed through June 20 between 9 a.m. to 3 p.m.  Sidewalk closures will
also occur during this time on the south side of Riverside Ave.

Cedar Road/Country Homes Boulevard Intersection Work- Crews will be installing a traffic signal at
the Cedar Road/Country Homes Boulevard intersection.

Mission Avenue from Hamilton to Perry- Construction continues with the two
eastbound lanes of Mission from Hamilton to Perry Street closed. This project will reconstruct the street by
replacing the asphalt surfacing, including ADA ramps, as needed.  

Rowan Avenue Sidewalks- The project will install 8 foot sidewalks on both
sides of Rowan Avenue from Belt Street to Monroe Street with ADA compliant curb
ramps.

Francis Avenue from Division to Crestline- This
project will rehabilitate Francis Avenue from Division to Crestline
Streets. Traffic
is open on the south side of Francis with one lane in each direction.  

Francis and Freya Signal Work- the signal is being replaced. Flagging
at the intersection takes place between 9 a.m. and 3 p.m. The dedicated right turn lane is closed for southbound traffic on Freya Street in order to construct the new
roadway at the northwest corner. 

Arthur Street from I-90 to 2nd- Arthur Street is closed from 5th Avenue to 2nd Avenue. Third Avenue is reduced to one lane at
the intersection of Arthur.  This
project is to repave Arthur from I-90 to 2nd Avenue, add sidewalks
along the west side of Arthur, and adds curb ramps and pedestrian lighting.




Translate (Traducir/Перевод) »